Ticket ID: B7
Parent
#248 — orpc-v2: consolidate fork into everything-dev and migrate platform to oRPC v2 + Effect 4 (epic)
What to build
Stage B gate — the integrate-and-verify ticket where green is finally promised. On the orpc-v2 branch: full monorepo test/lint/typecheck, browser + api regression suites against a spawned stack, dev-stack smoke, bos mf check. Then atomic merge + release:
- Merge
orpc-v2 to main in one piece.
- Changesets + npm publish for every-plugin and everything-dev so generated child repos can
bos upgrade.
- Redeploy the everything.dev runtime (
bos publish --deploy) and spot-check key routes + MCP.
- Update repo docs for the new patterns (scoped-resources guidance → Layer pattern; publisher rename notes; AGENTS.md common-pattern sections).
Acceptance criteria
Blocked by
Ticket ID: B7
Parent
#248 — orpc-v2: consolidate fork into everything-dev and migrate platform to oRPC v2 + Effect 4 (epic)
What to build
Stage B gate — the integrate-and-verify ticket where green is finally promised. On the
orpc-v2branch: full monorepo test/lint/typecheck, browser + api regression suites against a spawned stack, dev-stack smoke,bos mf check. Then atomic merge + release:orpc-v2to main in one piece.bos upgrade.bos publish --deploy) and spot-check key routes + MCP.Acceptance criteria
orpc-v2branch fully green (tests, lint, typecheck, regression suites, mf check)bos upgradeverifiedBlocked by