Skip to content

orpc-v2: Stage A integrate and verify (wire-compatible Effect 4) #257

Description

@elliotBraem

Ticket ID: A5

Parent

#248 — orpc-v2: consolidate fork into everything-dev and migrate platform to oRPC v2 + Effect 4 (epic)

What to build

Stage A gate: integrate the Effect 4 work on the effect-4 branch and verify the whole platform wire-compatibly. Full monorepo test/lint/typecheck, browser + api regression suites against a spawned stack, dev-stack smoke. Merge Stage A to main — Stage B (orpc-v2 branch) cuts from here.

Acceptance criteria

  • effect-4 branch: full test + lint + typecheck + regression suites (browser + api) green
  • Dev stack smoke passes; deployed wire contract unchanged
  • Stage A merged to main; go decision for Stage B recorded on the epic
  • orpc-v2 integration branch cut from merged main

Blocked by

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    ready-for-agentFully specified, ready for an AFK agent

    Type

    No type

    Fields

    Priority

    None yet

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions